Fields

Air Taxis (eVTOL)

How close are electric air taxis to carrying passengers at scale?

View on the tracker
Tracked metrics

From this field

Milestone note Oct 21, 2026

First FAA certificate letting an eVTOL carry non-crew passengers

Reached

BETA Technologies — Alia A250, special airworthiness certificate for market surveys — The FAA issued BETA Technologies a special airworthiness certificate for market surveys covering the Alia A250, announced by Transportation Secretary Sean Duffy on 21 Oct 2026 — the first for an electric vertical-takeoff aircraft. Issued under Part 21, it lets BETA fly the aircraft for prospective operators and customers, and carry them, within FAA limitations, ahead of type certification. It does not permit commercial or fare-paying operations. BETA flew the A250 on 20 Oct from Plattsburgh, New York, to Burlington, Vermont (~34 nmi, 20 min), taking off and landing vertically with wing-borne cruise; it had earlier received the same kind of certificate for its conventional-takeoff CX300. This is the step between company test flights and service — people who are not crew aboard an uncertified eVTOL — not the service itself.

Milestone note Sep 10, 2026

First eVTOL flights under the US federal pilot programme

Reached

Joby Aviation — eIPP, Dallas–Fort Worth, Texas — Joby began flying on 10 Sep 2026 under the White House-backed eVTOL Integration Pilot Program — the first aircraft to do so — running a week-long campaign on real routes across North Texas, including a round trip into Dallas Fort Worth International and its controlled airspace on 12 September. The point of eIPP is to generate operational safety data before commercial rules exist, so this is flying inside the national airspace system ahead of full FAA type certification rather than after it. These are company flights on a published schedule, not a service: no passengers are being sold seats, and certification remains the gate.

Milestone note Aug 2026

First transition flight for a lift-plus-cruise air taxi

Reached

Eve Air Mobility (Embraer) — On 3 Aug 2026 Eve's prototype fired its rear pusher propeller in flight for the first time, holding a stabilised 27 knots (30 kt peak) with the pusher up to 1,200 rpm — a 3 min 9 s, 0.84 nm hop at 90 ft over Embraer's Gavião Peixoto test centre. It is a partial transition: the aircraft has not yet flown fully wing-borne. The step matters because it validates the no-tilt lift-plus-cruise layout Eve bet on instead of the tiltrotors flown by Joby and Archer. Type certification and entry into service are targeted for 2027–2028.

Milestone note Jul 2026

First purpose-built commercial vertiport certified

Reached

Skyports Infrastructure / Dubai GCAA — VDX — Dubai's General Civil Aviation Authority granted operational certification to Skyports' VDX vertiport — the first purpose-built commercial eVTOL vertiport anywhere to clear a regulator. The four-storey, ~3,100 m² building has two take-off and landing areas, rapid charging and passenger handling, with a stated capacity of up to 170,000 passengers a year. Joby holds a six-year exclusive for the Dubai air-taxi market. A certified place to land is not a service: no commercial passenger flights operate from it yet.