Milestone note Reached Jun 2025
Westinghouse $180M ITER vacuum-vessel contract
ITER / Westinghouse — A $180M contract for Westinghouse to complete and weld ITER's vacuum vessel — the hermetic double-walled steel chamber that houses the plasma — joining its nine sectors into a single ring, the most intensive stage of ITER assembly.
Auto-drafted from a verified measurement, then human-checked.