Milestone note Reached Jun 2026
World's first export SMR construction begins
Rosatom / Uzbekistan — First safety concrete was poured at the Jizzakh site near Lake Tuzkan — the first plant built anywhere under an export SMR contract. Rosatom is supplying two RITM-200N reactors (2×55 MWe) alongside two VVER-1000s for a 2.1 GW hybrid plant; first unit targeted for 2029.
Auto-drafted from a verified measurement, then human-checked.